The San Onofre Nuclear Generating Station is seen in this file photo. (KABC Photo)
SAN CLEMENTE, Calif. (KABC) -- Southern California Edison says more than 1,300 damaged tubes at the troubled San Onofre nuclear plant will be taken out of service.
The plant has been offline for more than three months due to the tubing deterioration. The figures released Tuesday come just days after SCE said it hopes to restart at least one of the plant's twin reactors next month.
The chairman of the Nuclear Regulatory Commission insists there is no timetable for restarting the plant.
Costs related to the long-running shutdown could climb over $100 million, company officials say, and state officials have warned about possible rotating blackouts in Southern California while the reactors are offline.
About 7.4 million Californians live within 50 miles of San Onofre, which can power 1.4 million homes.
The Associated Press contributed to this report.
orange county news
- OC sheriff's reserve sergeant found beaten
- UK attack driven by radical Islam - officials
- Los Angeles mayoral race: Eric Garcetti wins 8 min ago
- Model murder trial: Case in hands of jury
- Bill proposed to reduce night airport noise
- Injured volunteer wants thousands from hiker
- Prop D, limit on pot shops in LA, passes
- Okla. tornado tore through 13,000 buildings
- abcnews: US IDs 4 Americans killed by drones
- Arias jury stuck but must keep deliberating
- Curious about caviar? Class available in WeHo
- Virgin tops, Spirit flops in airline survey
- OTRC: Critics' Choice Television Awards nominees
- ABC7 relief drive for Okla. tornado victims
-
Most Popular
-
Most Viewed StoriesMost Viewed VideoMost Viewed Photos
- abc7.com home
- Site Map
- RSS
- Advertise with Us
- Contact Us
- Online Public Inspection File
- Technical Help
- ABC.com
- ABCNews.com
- Privacy Policy
- Interest-Based Ads
- Safety Information for this site
- Terms of Use
- Copyright ©2013 ABC Inc., KABC-TV/DT Los Angeles, CA. All Rights Reserved.





