ABC7 Traffic Center

LIRR service resumes after earlier suspensions

Monday, January 13, 2014

All LIRR service has been restored after earlier suspensions due to signal problems earlier Monday.

Service was suspended in both directions between Jamaica and Penn Station and also on the Port Washington branch between Woodside and Penn Station just after 10 a.m.

Eastbound service had been restored between Penn Station and Jamaica, with the first eastbound train departing Penn Station at 12:05 p.m.

Westbound service resumed shortly after with a 12:13 train from Jamaica.

The signal problems originated east of the East River tunnels.

(Copyright ©2014 WABC-TV/DT. All Rights Reserved.)

Get more ABC7 Traffic Center »


Tags:
mass transit, long island railroad, abc7 traffic center
blog comments powered by Disqus
Advertisement