October 13, 2013 (GREEN BAY, Wis.) -- Crews that built the now-closed Leo Frigo Memorial Bridge in Green Bay weren't able to rest its steel structure atop sturdy limestone bedrock, which some geologists and engineers say may have contributed to its sinking pavement.
Wisconsin highway officials discount that theory. They say steel corrosion at ground level is the likely culprit that forced the indefinite closure of the bridge, which carried about 40,000 cars daily over the Fox River.
The Green Bay Press Gazette reports Sunday that some experts say underground soil that was sturdy enough to support the bridge when it opened three decades ago might have deteriorated in subsequent years (http://gbpg.net/16Yl8h0). Bill Kallman, a Michigan engineering consultant who has worked on bridges in New York, says he thinks that's a more plausible explanation than corrosion.
wisconsin news
- Congress sends bill on debt, shutdown to Obama
- Victim, victim's mom testify at bat attack trial
- VOTE in the Jeopardy: Battle of the Decades
- ABC7 Weather Forecast
- Shooting victim collapses in Walgreens near DePaul campus
- TV pitchman Kevin Trudeau headed back to jail
- Boy, 12, brings gun to school in Berkeley
- 2 dead in Fernwood shooting near 105th, Lafayette
- Possible Krokodil case being treated in McHenry Co.
- Mayor tables plan to rename Stony Island Ave.
- All LSD lanes reopened after crash at S-Curve
- Speed cameras issue tickets at Gompers Park
- Schaumburg mom missing 4 days
- abcnews: Obama Praises Deal After Senate Approval
- abc7chicago.com home
- Site Map
- RSS
- Advertise with Us
- Contact Us
- Online Public Inspection File
- Technical Help
- ABC.com
- ABCNews.com
- Privacy Policy
- Interest-Based Ads
- Safety Information for this site
- Terms of Use
- Copyright ©2013 ABC Inc., WLS-TV/DT Chicago, IL. All Rights Reserved.




